Two Custom Specified Loading Bays for Top Mushroom Producers

Two Custom Specified Loading Bays for Top Mushroom Producers

Comech Engineering recently installed two custom specified loading bays for a top mushroom producing company. Seven tonne capacity dock levellers fully galvanized were installed along with 40mm thick insulated sectional loading bay doors. The bays were then fitted with adjustable head, dock seals so as to environmentally seal the bays during the loading process, the […]

New Loading Bay Equipment Installation

New Loading Bay Equipment Installation Northern Ireland

Comech Engineering design, install and commission Three Loading Bays for Leading Chicken Producer Working along with consulting engineers and main contractor – Comech outlined the requirements structurally to support the installation which could then run smoothly for the dock levellers, installated sectional doors and dock seals. Equipment was interlocked for safety. Work was scheduled in […]

Loading bay installation for Pat Mc Gowan Transport

Loading bay installation for Pat Mc Gowan Transport

Recent installation and commissioning of 2 Loading bays for Pat Mc Gowan Transport. Dock levellers are interlocked with Insulated Roller shutter doors for safe operation. Led Traffic lights sequenced with the loading operation to Indicate load safe to move off the bay. Durable Nytrex dock bumpers and adjustable cushion seals for Environmental sealing on the […]

Disabled Access Door Installation, Aisling Centre Enniskillen

Disabled Access Door Installation, Aisling Centre Enniskillen

Comech Engineering Ltd. supplied and commissioned an aluminum framed disabled access swing door at the Aisling Centre, Enniskillen at the rear of the building. Comech supply, install and maintain all types of automatic door systems in Northern Ireland Also retrofitting of Besam, Tormax,Kone,Dorma and all other brands of Automatic door systems. Upgrading of older and […]

No Opening too Small! Recent High Speed Door Installation

Comech Engineering

Comech Engineering Ltd. Recently installed and commissioned, 6.5m wide x 7.5m high high speed door at ETPNI, new warehouse. Specializing in Speed doors in Northern Ireland, Comech Engineering Ltd. Can provide the right solution for each project. From Inverter driven High speed doors, to highly insulated speed doors with excellent U Values insuring a saving […]

Moy Park – Bespoke Dock levellers.

Comech Engineering Ltd have supplied installed and commissioned 2 Loading bays for Moy park, Marks and Spencer’s  Dine In contract. 2 Bespoke 7000kg Rated dock levellers with double rams for durability were installed along with loading bay doors and cushion dock seals with an adjustable head seal. The Dock seals are ideal for the food […]

Coldstore High Speed Door Installation

Coldstore High Speed Door Installation

Here you can see our recent installation of a Thermador Coldstore High Speed door at C & O Milligan Coldstores, Ardglass, Co Down. This speed door uses Innovative technology to drive the door and remain frost free at -40 degrees C. Using heat trace elements, heaters and fans to re circulate the warm air around […]

Innovative Nytrex Products

Nytrex Product Range

We have recently completed the installation of these Nytrex Dock Bumpers and Trailer Landing Plates: Nytrex Sliding Bumpers: Our rubber bumpers are extremely durable and so have a very long life span and are even eventually reversible, further increasing the life span. They are cushioned on rubber packers which take the brunt of the impact, making […]

Mega Trailer Loading Bay

Here you can see our recent installations of a 5 metre high loading bay to accommodate the mega trailers at Eglinton Timber Products Northern Ireland. We installed one of our fantastic Hormann insulated sectional doors and a dock leveller with LED traffic lights and adjustable cushion dock seals. The installation was a great success and […]