Recent Installation at Medical Device Facility Northern Ireland: Comech Engineering spiral door installation in existing…
New Loading Bay Equipment Installation
Comech Engineering design, install and commission Three Loading Bays for Leading Chicken Producer
Working along with consulting engineers and main contractor – Comech outlined the requirements structurally to support the installation which could then run smoothly for the dock levellers, installated sectional doors and dock seals.
Equipment was interlocked for safety. Work was scheduled in phases with the main contractor resultingin a structured installation plan well ahead of schedule.
The loading bays have a seamless transfer of goods to shipping, seals creating a physical barrier to keep out bad weather, birds, insects and airbourne microbes and sectional insulated doors minimise the loss of treated cooled air inside the building.
As well as telescopic lips and non slip surfaces, Comech Engineering also offers many options for its dock levellers such as heavy duty designs to 10 tonne capacity, platform insulation, galvanised finishes and safety interlocks. Special sizes and pit recessed designs are also supplied as an integral traffic system.